City · California
San Bruno: Sale inspection of the lateral, which the code ends at the wye
San Bruno requires a sewer lateral inspection and a city certificate when a residential property built 50 or more years before the deed is recorded is about to be transferred. The city's page dates enforcement to May 8, 2015. The lateral the ordinance is talking about runs from the end of the building drain and ends at the wye or other manufactured connection to the public sewer.
Last verified against the official pages listed below. If a number is not on those pages, it is not on this one.
- Property owner
- Utility or city
- Not assigned by the page we read
Open this place in the checker City of San Bruno Public Works
The trigger is the age of the house at the recording of the deed
San Bruno Municipal Code section 10.13.030 says that, with the exceptions in the section, before a residential property originally constructed fifty years or more from the date of recordation of the deed is transferred, the owner must inspect the sanitary sewer lateral at the owner's expense. Any repair the city requires has to be completed and approved before the certificate and before transfer of title. The owner has a video inspection made to city standards and gives the video to the city. If the city finds the pipe defective, the owner repairs or replaces it to city standards. The city then issues the certificate.
The city's program page says the same thing more briefly: if your home is over 50 years old, the lateral must be inspected and certified before it is sold. The program description ties the ordinance to a consent decree and to Ordinance No. 1822, with council approval on April 8, 2014 and enforcement on May 8, 2015. The code's definition of the sanitary sewer lateral is the part of the drainage system from the end of the building drain to a public sewer or other disposal point, terminating at the wye or other manufactured connection to the public sewer.
Condos, shared laterals, and some recent work are outside the rule
Section 10.13.030 lists exceptions. Condominium or cooperative buildings, and the units in them, are out, except as a condition of conversion. Properties that share a lateral with another property are out. Transfers that do not involve a county transfer tax are out. A certificate lasts five years. A test that needed only partial repairs, or none, also lasts five years if the repairs were permitted and inspected. Alterations to the location of or connections to the lateral, permitted and approved, last five years. A complete replacement that the city accepted lasts twenty years.
The city's FAQ matches those terms in plain language. A private sale or a transfer inside a family still needs a certificate. A bank-owned property still needs one. A condo or townhouse on a shared lateral does not need an individual certificate. A certificate issued four years ago is still good, because certificates last five years from the date of award. The FAQ says that if you sell after the five years, you inspect again.
The extension is 180 days, and the escrow deposit is $7,500
Section 10.13.040 says the lack of a certificate does not, by itself, make the underlying transfer illegal. If the certificate cannot be obtained before title transfers, the owner may ask the public services director in writing for a time extension of up to 180 days. The request includes the fee in the San Bruno master fee schedule. As a condition of the extension, $7,500 is posted into an escrow account.
The code section we read was cut off in the public excerpt after the escrow sentence, so we are not summarizing the rest of the forfeiture language from memory. Read 10.13.040 on the city's code host before you rely on what happens to the $7,500. The video review itself goes to the Wastewater Division. The certificate application says the applicant receives either a certificate or a deficiency form by email after the city reviews the video.
Before you call City of San Bruno Public Works
- Count 50 years from original construction to the expected recording date, not to the listing date.
- Check the exceptions before you order a video: shared lateral, condo, no transfer tax, or a certificate or full replacement still inside its 5-year or 20-year window.
- Send the video to Public Works. Repairs the city requires have to be approved before the certificate.
- If you need the 180-day extension, budget the master-fee-schedule fee and the $7,500 escrow deposit as two different figures.
The 50 years are measured from original construction to the date the deed is recorded, not from the day the house was listed. A house that is 49 years old on listing day can age into the rule before recording.
The comparison table puts this split next to the other places we have sourced. The method explains why a city with no page is left out.
Rules that do not match San Bruno
- Berkeley: Certificate required; the city's page describes the private lateral as typically curb to building.
- Oakland: EBMUD tests the upper and lower lateral in Oakland.
- Mountain View: Permit line at the property-line cleanout; diagram shows owner and city portions.