City · Massachusetts

Boston: Owner from inside the building to the BWSC main

Boston Water and Sewer Commission says it maintains its sewer main in the public way, and that the property owner pays to maintain and repair the entire building sewer from inside the basement to the commission's main in the street. The commission also publishes a reimbursement program with two dollar caps, for owners who qualify.

By C. V. Wooster, Taciturn Studios · Checked November 21, 2026 · How we research

Last verified against the official pages listed below. If a number is not on those pages, it is not on this one.

Boston Water and Sewer Commission assignment, as published
Building sewer from inside the building to the BWSC mainProperty owner
BWSC sewer main in the public wayUtility or city

Open this place in the checker Boston Water and Sewer Commission

BWSC Operations, for a lateral inspection appointment under the assistance program: 617-989-7900

The building sewer is yours on both sides of the property line

BWSC's sanitary sewer overflow page defines a lateral, or building sewer, as the waste pipe connecting a property to the BWSC main in the street. It says property owners are responsible for maintenance and repair of the entire lateral from inside the basement to that main. The financial assistance page adds that the owner also pays the cost of finding or relieving a blockage in the entire lateral from the foundation to the connection. Maintenance, on that page, includes cleaning debris, removing grease, and cutting roots. Repair includes removing blockages, lining, replacing collapsed pipe, and fixing leaks.

The commission's 1998 sewer-use regulations, article II, section 7, say building sewers and building storm drains are owned by the owner of the premises served whether they are on public or private property. Where more than one premises connects to the same pipe, those owners are jointly and severally responsible. Repairs to private sewers are made by a licensed drain layer. A new or reconstructed building sewer needs a General Service Application before construction.

If the snake clears the line, you pay the snake

The assistance page draws a hard line between clearing and rebuilding. If the licensed and bonded contractor clears the line by power rodding or snaking, the owner pays all of that cost. The grant is for the case where the contractor cannot clear the blockage, or the pipe is collapsed or leaking, and BWSC verifies the condition. The owner calls Operations at 617-989-7900 to schedule a lateral inspection so BWSC and the contractor can look at it together.

Eligibility on the page requires all of the following: the lateral is blocked, collapsed, or leaking; BWSC has verified that; the BWSC account is current; the owner has three estimates from contractors licensed and bonded by BWSC; the building has not used the program in the last 10 years; and BWSC has confirmed eligibility in writing. The owner signs a waiver, gets authorization, pays the contractor in full, and BWSC inspects. A check not exceeding the authorized $8,000 or $6,000 is issued within two to three weeks. Work is supposed to be finished within 30 days of the eligibility determination unless BWSC approves an extension.

The two caps are an 8-foot relay and a full line

BWSC states the maximum reimbursement as either $8,000 for an 8-foot relay or $6,000 for a full lateral line. A property is eligible only once every 10 years. The page warns that a partial repair can restore flow without stopping leaks somewhere else in the pipe, and it encourages owners who are approved for excavation to put the grant toward replacing or relining more of the lateral, because the grant is one-time assistance.

Those amounts are caps on a reimbursement. They are not what a Boston lateral costs, and they are not paid up front. The commission's compliance reports repeat the underlying ownership rule in a sentence: laterals are owned by the owner of the property where they are located, so the cost of repairing a leaking lateral is the owner's. The grant does not change that sentence. It refunds part of the bill after the work, if you qualified.

Before you call Boston Water and Sewer Commission

The grant is not available because a pipe is old. BWSC has to verify that the lateral is blocked, collapsed, or leaking, the account has to be current, and the building cannot have used the program in the last 10 years.

The comparison table puts this split next to the other places we have sourced. The method explains why a city with no page is left out.

Rules that do not match Boston

Sources

  1. BWSC Sewer Lateral Financial Assistance Program
  2. BWSC, Sanitary Sewer Overflows
  3. BWSC regulations governing sanitary and combined sewers (1998)